gi banner

Galvanized Steel Exporter to UAE

We ship DX51D galvanized coils and narrow strips directly from our factories in China to Jebel Ali, Abu Dhabi, and Sharjah. In the past year, we have shipped over 580 tons of goods for our UAE customers – including a flexible pipe manufacturer in Dubai that needed narrow strips with thicknesses reduced from 0.22 mm to 13 mm; a hose manufacturer in Sharjah that ordered 280 tons with just one phone call; and a steel trader who shipped 200 tons via bulk carrier. Each coil is micrometer-tested and comes with a factory test certificate containing actual data.

  • Chilean Ports Served: 4
  • Thickness Range: 0.12–5.0mm
  • Average Production Lead Time: 15 Days

Why Wanzhi Steel

UAE buyers usually care about three things: does the zinc coating hold up, is the thickness what you ordered, and will the paperwork clear Jebel Ali without storage fees. We’ve had all three conversations with our UAE clients, and here’s what we do differently.

Micrometer Thickness Check

We run a digital micrometer over every coil before it leaves the yard. A UAE trader who ordered 200 tons of GI coil checked the thickness himself on arrival — every roll came in under 0.02mm off spec. He sent us a photo of the caliper reading.

10–15 Day Production

We run two galvanizing lines and our own slitting line, so we don’t outsource. A Sharjah flexible hose maker sent us an inquiry on a Monday, we confirmed every spec that afternoon and guaranteed 10–15 days. They wired the deposit the same day.

Custom Coil Weight Control

Some UAE pipe mills can only handle coils under 2 tons because of their uncoiler. On a 280-ton strip order, our factory technicians wound every roll at around 1.3 tons — well inside their limit. We also do 20–25kg hand coils for smaller lines.

UAE Climate Ready

A coil sitting on a Dubai rooftop in July can hit 75°C. We match zinc weight to where it will be used — G20 for interior ductwork, G60 or G90 for anything within a kilometre of the coast. Zero spangle gives a denser layer that holds up better in salt air.

All UAE Ports Covered

Most of our UAE orders go through Jebel Ali, but we also ship to Khalifa Port, Sharjah, and Ras Al Khaimah depending on which is closer to your warehouse. For orders over 200 tons, we’ll quote a bulk vessel — one trader saved enough on freight to cover his inland transport.

Full Documentation Set

UAE customs doesn’t complicate steel imports, but a missing document means port storage charges that add up fast. We send the full set — invoice, packing list, B/L, certificate of origin, Mill Test Cert EN 10204 3.1 — within 3 days of the vessel sailing.

Narrow galvanized steel strip
gi strip
gi coil

Climate Adaptation

Specified for Chile’s Four Climate Zones,From the Atacama’s UV blast to Valdivia’s constant drizzle, galvalume outlasts galvanized in every Chilean climate. Here’s what we recommend by region.

Flexible Steel Pipes

Dubai · Sharjah · Ajman
Narrow-width galvanized strip (0.20–0.50mm × 10–30mm) for flexible metal hose and conduit production. Consistent thickness ensures smooth forming and welding.

Roofing & Construction

Dubai · Abu Dhabi · RAK
GI coils and corrugated sheets for warehouse roofs, factory sheds, and commercial buildings. G40+ coating recommended for exterior exposure in UAE heat and sun.

Steel Trading & Distribution

Jebel Ali Free Zone
Bulk GI coils for steel traders and distributors serving the UAE and re-export market. Competitive pricing, bulk vessel options, and consistent quality for resale.

Container Loading

Container Loading

Packed for 18–25 Days at Sea→Galvanized steel needs moisture protection during the sea voyage from China to the UAE. We use vertical packaging with moisture-proof paper inner lining, steel strapping, and wooden pallets — and send photos before the doors close.

ContainerLoad CapacityCoils
20ft GP20–24 Tons4–6
40ft GP24–27 Tons5–7
40ft HQ25–28 Tons6–8
Bulk Vessel100+ TonsFull hold
  • Moisture-proof paper + plastic film inner wrap
  • Steel strapping + timber blocking per coil
  • Loading photos sent before departure
  • Bulk vessel option for 100+ ton orders

Logistics Route

Direct sea route from Chinese ports to Jebel Ali — the Middle East’s largest container hub. No transshipment, no rail transfer.

SEA 18–25 days China Shanghai / Qingdao Jebel Ali Dubai, UAE Sharjah Abu Dhabi
Sea Freight (Direct)

Step 1: Production in China

7–15 days. Slitting, galvanizing, micrometer check, packaging with photo updates before the container seals.

Step 2: Sea to UAE Port

18–25 days from Shanghai/Qingdao to Jebel Ali, Abu Dhabi, or Sharjah. Direct service, no transshipment.

Step 3: Customs Clearance

Full documentation set provided for UAE customs. Digital copies sent within 3 days of sailing — no port storage delays.

Step 4: Delivery to Your Factory

Arrange inland transport from Jebel Ali to Dubai, Sharjah, Abu Dhabi, Ajman, or any UAE emirate.

Popular Specs

Galvanized Steel Specs Ordered by UAE Clients→These are the specs our UAE clients order most often. Custom grades, thicknesses, widths, and zinc coatings available on request.

ParameterStandard RangeUAE Best-Seller
GradeDX51D, DX52D, DX53D, S250GD, S350GD, S550GD, SPCC, SGCC, A653, etcDX51D (most) · SGCC · S350GD
Thickness0.12 – 5.0 mm0.4 - 4mm
Width (Coil)600 – 1500 mm1000mm / 1219mm / 1250mm
Width (Strip)Custom slitting13mm / 20mm / custom to ±0.1mm
Zinc Coating30–275g/m²G20 (60–100g/m²) standard · G60+ coastal(≤275g/m²)
SurfaceRegular / Zero / Minimized / Big / spangleZero spangle (strip) · Regular (coil)
Coil ID508mm / 610mm508mm (20") standard
Coil Weight3 – 8 MT≤2 MT (pipe mills) · 3–5 MT (general)
StandardASTM A653 / EN 10346 / JIS G3302ASTM A653 · EN 10346
MOQ10 Tons (standard)20ft container ≈ 22 Tons

FAQ

Questions UAE Buyers Ask Us

What's the smallest order you can ship to the UAE?

Theoretically, the minimum order quantity for standard specifications is 10 tons, but frankly, the unit price for a 20-foot container (approximately 22 tons) is more cost-effective—the LCL (Less than Container Load) shipping and handling fees for small batches significantly reduce profits.

How do I know the thickness and zinc coating are what I paid for?

Each coil of steel undergoes digital micrometer and zinc coating thickness gauge testing before leaving the factory to ensure that the manufactured products meet customer requirements, as we have a strict testing process. If you are concerned, you can arrange for SGS third-party inspection (see our SGS report), at your own expense.

How long from order to delivery in the UAE?

The production cycle is 7-15 days, depending on the specifications and whether processing (slitting or cutting) is required. Sea freight from Shanghai or Qingdao to Jebel Ali Port takes 18-25 days, without transshipment. Therefore, from paying the deposit to the goods arriving at the port, it takes approximately 30-40 days in total. A hose manufacturer in Sharjah confirmed the specifications on Monday, paid the deposit that afternoon, and we guarantee production within 10-15 days. If you have an urgent delivery deadline, please inform us in advance, and we will do our best to prioritize your order.

Do you offer samples before I place a full order?

Absolutely. We can send you samples of our previously manufactured products (that meet your requirements), which typically take 5-7 days to arrive in the UAE. For special specifications, we will let you know if we have similar samples for your testing.

What payment terms do you work with?

Standard is 30% T/T deposit to start production, 70% against the B/L copy before the vessel sails. Our 200-ton bulk order client used exactly this. For first-time buyers or larger orders.

Can I visit your factory before ordering?

Of course! We warmly welcome you to visit our factory. We will arrange for our production manager to meet you and show you around our continuous hot-dip galvanizing production line and coating laboratory. Please let us know your travel dates, and we'll handle the rest.

Related Products